OUTFITED DOCK
Construction and outfitted NEW DOCK, Phases 1 and 3 at API Coatzacoalcos, based on pipe piles and steel sheetpiles.
-
1,112 driven steel sheetpiles measuring 36 m (20% vertical 80% inclined 1:4 y 1:5).
-
314 driven sheetpiles and beams HZM measuring 28 m.Included installation of tensors according to the project.