top of page
GBC Pagina 3 (cambios) 3 logo verde.png

COMBINED WALL DRIVE

One km of driven metallic sheetpile for the construction of Terminal A Phase 1 at the new Port of Veracruz.

 

  • 512 Piles HZ 1180 M B-14 OF 32.00 m

  • 512 Sheetpiles AZ 24-700 OF 26.80 m

  • 752 Sheetpiles AZ 24-700 OF 9.14 m

  • 512 Anchorage Piles HP 410 OF 13.00 m

© 2020 Derechos Reservados, Cimentaciones GBC.

  • Youtube GBC
  • Linkedin GBC
bottom of page